ELSFLETHER WERFT 209'63.7 m.
Main Characteristics
Length O.A.: 209 ft. / 63.72 m.
Beam: 8.90 m.
Engines: 2x Caterpillar 1550HP
Cruising Speed: 13 knots
Top Speed: 15 knots
Fuel Capacity: 205000 lts
Water Capacity: 63900 lts
More info
Builder
Built by ELSFLETHER WERFT in 1986
Rebuilt / Refitted: 2025
Accommodation
Cabins: 6  |  Guests: 12
Asking Price
Price on Application
Sales Enquiry
Highlights
NAVAL ARCHITECT Elsflether Werft
EXTERIOR DESIGNER Francesco PaszkowskiDesign
INTERIOR DESIGNER Francesco PaszkowskiDesign
CLASS Bureau Veritas
CONTRUCTION Steel Hull & Aluminum Superstructure, Teak Deck
DISPLACEMENT 850
Equipment
Tenders & Watersports

1 x Castoldi 18 rescue boat
1 x Protector 8.5m rib
1 x Protector 11m chase tender
2 x Waverunners
1 x Stand-up Jet-Ski
1 x Flyboard
Wakesurf
1 x Kayak
Towable Toys
1 x Wakeskate
Scuba Diving Equipment
1 x Seabob
Inflatable jet-ski dock
1 x Kneeboard
1 x Sea-Scooter
1 x Wake Board
Water-Skis

Refit & Maintenance Notes (2025)

General Works
Vessel’s hull and superstructure was fully painted to snow white color. New antifouling wasapplied in underwater area
Sun Deck
Awning’s system pillars were replaced and new sunshades were installed. Sofas in the aft lounge area were replaced along with the fabrics of the loose furniture. Jacuzzi had its annual service.Upper DeckNew Furuno Marine Monitors were installed in the wheelhouse. Loose furniture fabrics’ replaced.
Main Deck
Bulwarks were constructed on both port and starboard sides additionally to new stainless steel rails. Passerelle had its annual service. Folding balcony in Master cabin was serviced.
Lower Deck
Garage area was fully painted and a new beach area was constructed. Bow thruster compartment was also painted. Tenders serviced along with jetskis and toys. Cabins area was upgraded with new multimedia system and new fabrics and pillows.

Mechanical Works and Upgrades

All mechanical systems were either serviced, overhauled or replaced (pumps, pipes, valves, flanges, gauges, compressors). Pumps related to cooling the main engines were overhauled. The injectors, high pressure pipes and the electric starter were replaced with new ones.
The gearboxes had their annual service. Diesel generators were serviced as well. The fore crane was inspected, and its motors were overhauled.
The HVAC system was comprehensively serviced and upgraded, since all pumps along with their motors were overhauled, the compressors were also overhauled. Additionally, a new AHU was installed in the Master cabin and the Crew area. Fans in Engine Room, Steering Gear Room, Galley and Laundry were overhauled and balanced.
Bow Thruster motor was overhauled. Important upgrade to the stabilizers which are now zero speed. Windlass motor replaced with bigger one, since new heavier anchors and anchor chains were installed.
A great upgrade too, is the new Hamman sewage treatment system which facilitates the yacht's operation. Inlet and outlet seawater valves and pipes were either cleaned and serviced or replaced where needed.
Fresh water system had substantial upgrades besides. New pipes from tanks to pump suction, new filters, pumps were overhauled and a new pressurized system for decks was installed.

View more
View less
Whatsapp
ENQUIRY

    You are interested in

    Name

    Email

    Phone number

    Message

    I have read and agree to the Privacy Policy